Email: info@kutirdesign.com | Phone: +880255085240 | Hotline: +8801913831770
Facebook Twitter Google+ LinkedIn

Pre Engineered Buliding

Technological improvement over the year has contributed immensely to the enhancement of quality of life through various new products and services. One such revolution was the pre engineered buildings. Through its origin can be traced back to 1960’s its potential has been felt only during the recent years. This was mainly due to the development in technology, which helped in computerizing the design and design.

Though initially only off the shelf products were available in these configurations aided by the technological development tailor made solutions are also made using this technology in very short durations. A recent survey by the Metal Building Associations (MBMA) shows that about 60% of the non residential low rises building in USA are pre engineered buildings(PEB).

Although PEB systems are extensively used in industrial and many other non residential constructions world wide, it is relatively a new concept in India. These concepts were introduced to the Indian markets lately in the late 1990’s with the opening up of the economy and a number of multi nationals setting up their projects.The market potential of PEB’s is 1.2 million tones per annum. The current pre engineered steel building manufacturing capacity is 0.35 million tones per annum. The industry is growing at the compound rate of 25 to 30 %.

Pre Engineered Building

Applications of Pre Engineered Buildings (PEB):

  • WAREHOUSES
  • FACTORIES
  • WORKSHOPS
  • OFFICES
  • GAS STATIONS
  • VEHICLE PARKING SHEDS
  • SHOWROOMS
  • AIRCRAFT HANGARS
  • METRO STATIONS
  • SCHOOLS
  • RECREATIONAL
  • INDOOR STADIUM ROOFS
  • OUTDOOR STADIUM CANOPIES
  • BRIDGES
  • RAILWAY PLATFORM SHELTERS

Advantages of Pre Engineered Buildings:

REDUCED CONSTRUCTION TIME: Buildings are typically delivered in just a few weeks after approval of drawings. Foundation and anchor bolts are cast parallel with finished, ready for the site bolting. Our study shows that in India the use of PEB will reduce total construction time of the project by at least 50%. This also allows faster occupancy and earlier realization of revenue.

LOWER COST: Due to the systems approach, there is a significant saving in design, manufacturing and on site erection cost. The secondary members and cladding nest together reducing transportation cost.

FLEXIBILTY OF EXPANSION: Buildings can be easily expanded in length by adding additional bays. Also expansion in width and height is possible by pre designing for future expansion.

LARGE CLEAR SPANS: Buildings can be supplied to around 80M clear spans.

QUALITY CONTROL: As buildings are manufactured completely in the factory under controlled conditions the quality is assured.

LOW MAINTENANCE: Buildings are supplied with high quality paint systems for cladding and steel to suit ambient conditions at the site, which results in long durability and low maintenance coats.

ENERGY EFFICIENT ROOFING AND WALL SYSTEMS: Buildings can be supplied with polyurethane insulated panels or fiberglass blankets insulation to achieve required “U” values.

ARCHITECTURAL VERSTALITY: Building can be supplied with various types of fascias, canopies, and curved eaves and are designed to receive pre cast concrete wall panels, curtain walls, block walls and other wall systems.

SINGLE SOURCE RESPONSIBILTY: As the complete building package is supplied by a single vendor, compatibility of all the building components and accessories is assured. This is one of the major benefits of the pre engineered building systems.

Follow Us

Our Services

Service 1 Service 2 Service 3 Service 4 Service 5 Service 6